![]() ![]() The strategy advocates that the easiest problems should be attacked first and diagnosis of water production problems should begin with information already at hand. For effective treatment, the nature of the problem must first be correctly identified. ![]() The objective of this thesis is a straightforward strategy for diagnosing excess water production problems in H-Field. While the controllable parameters are well production rate which seem to be higher than the well critical rate, completion, commingling strategy between two or more reservoirs with varying fluid properties and development well location (well density). The uncontrollable parameters are related to the reservoir and fluid properties such as higher viscosity (4.3 to 45cp), 28-35 API, high permeability of the formation (100 7000 md), very strong aquifer support (Infinite) and absence of solution gas, Traces-7.7 SCF/STB. Main H- Field now is producing oil rate under high water cut 80% and the reasons to the current high water cut phenomenon could be divided into two areas – un-controllable and controllable parameters. STUDY OF EXCESS WATER PRODUCTION FROM A SUDANESE OIL FIELD (STRATEGY FOR SOLUTION) /FAHMI ABDALLA ALAWAD HASSAN BASHIR NIMIR.-Khartoum:Sudan University of Science and Technology,Petroluem Engineering and Technology ,2004.-144p. ![]() Sudan University of Science and TechnologyĪLAWAD FAHMI ABDALLA. STUDY OF EXCESS WATER PRODUCTION FROM A SUDANESE OIL FIELD (STRATEGY FOR SOLUTION) Please use this identifier to cite or link to this item: ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |